Post-Survey Adjustment Workflow
- 1Site surveyor flags a sub-panel upgrade requirement in the mobile app
- 2System generates a revised work order and change order document
- 3Homeowner receives a text with a link to e-sign the updated contract
- 4Engineering team is notified to finalize the plan set for permitting